Case Studies
People... Products... Services... Cost Savings
Our broad product range is supported by an industry leading set of well
site preparation services, delivery, hook-up and custom packaging for
unique applications. From demanding urban locations to cold weather
service, Allied Technology can provide the right products, people,
packaging and services to reduce cost and ensure quick production.
Case Study - Double Pad/Well » show details
Part of Allied Technology’s strategy is to offer turn-key systems
that include products, packaging, site preparation and hook up. Our
goal is to ensure the safest, quickest and most cost-effective solution
to allow customers to begin rapid production at the well site.
A client in Oklahoma recently contracted Allied Technology to provide a
turn-key installation on a dual wellhead pad site that included site
preparation, delivery and hook up of 4 storage tanks, 2 horizontal
separators, and all related piping and hook-up from the wellhead to the
tank battery to the pipeline. Previously the client had to manage
multiple contractors and product suppliers, site preparation services,
delivery services, and roustabout services. Not only did this multiple
contractor approach take significant management and administrative time,
it also resulted in lengthy delays in coordination to complete the hook
up and begin production.
A typical job under the multiple contractor approach on a dual wellhead
pad site had been averaging 8-10 days to complete, if all of the
suppliers were well coordinated. Allied Technology assumed total
project responsibility for the job, completed all requirements in 36
hours and delivered the client one invoice for all services and
products. A time savings of 5-6.5 days, which translated into
significant additional income for the client as gas production, started
so much sooner with Allied Technology as the turn-key supplier.
Case Study - Turn Key Installation » show details
Installation start
+1 hour
+2 hours
+3 hours
+4 hours
+4 hours
+5 hours
+5 hours
+6 hours
+7 hours
+7 hours
Installation completion
» click to view next photo
Allied Production Solutions (APS), through its Titan Tanks and Vessels
business unit, was awarded a turn-key contract by Rising Star Energy,
LLC., to provide storage tanks, separators and to do all of the required
installation and hook up of the separator and the tanks. APS is unique
among our competitors in our ability to provide both equipment and
installation through our company crews as a single source so that delays
are minimized and production is initiated as soon as possible. The
photos illustrate our roustabout and installation progress from arriving
at the site until hook up was completed. The entire installation and
hook up of the tank battery and separator took only 7.5 hours resulting
in reduced time for the client to recognize revenue from production.
Quality equipment, delivery and rapid turnkey installation services
separate APS from our competitors.